What is the correct cooling time for butt fusion machine?

Are you still worried about choosing a reliable welding and piping equipment manufacturer?

If you've been itching to source an industry-leading Fusion Splicing and Piping Equipment Manufacturer, now is the perfect time to start such a project!

What is the correct cooling time for butt fusion machine?

Update Time:2022/8/24

The molten joint must be held immobile under force until cooled adequately to develop strength. 

The proper cooling times for the joint are dependent on the material, pipe diameter and wall thickness and are established by the pipe manufacturer or by applicable company, local, state, or federal standards. 

Allowing proper times under force for cooling prior to removal from the clamps of the machine is important in achieving joint integrity.